Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
D

Non-compliance with Power Strip Regulations

Bronx, New York Survey Completed on 12-09-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure the use of approved UL listed power strips, as observed during a life safety code survey. On the third floor lounge area, a Christmas tree was found plugged into an unapproved power strip. This observation was made on one out of four units, indicating non-compliance with specific NFPA codes.

Plan Of Correction

Plan of Correction: Approved December 19, 2024 Immediate Corrective Action: The Maintenance Director and Facility Supervisor on 12.03.2024 removed the unapproved power strip on the third floor of the facility. A Christmas tree was plugged into the extension cord and as such, required a direct outlet. The Maintenance team rectified this deficiency as of 12.04.2024. The Senior Administrator and Quality Improvement team issued a memorandum on 12.03.2024 to the Maintenance Director and facility team regarding power strips in accordance to CMS K-Tag 920. Identification of Others Potentially Affected: The facility respectfully submits all residents were potentially affected by this practice. System Changes to Prevent Recurrence: The Maintenance team are now mandated to have biannual Life Safety Code checklist in-services. The maintenance and facilities supervisor will conduct daily (M-F) maintenance walk-through ensuring existing UL power strips are installed as outlined in K-Tag-920. Quality Assurance Monitoring: The Facility supervisor will audit the daily test logs, monthly test reports and complete the quarterly internal tracker -K category to ensure compliance with the required Life Safety Code lists. Any deficiency identified for K-Tag 920 will be rectified immediately and subjected to quarterly internal audit by the quality assurance unit until substantial measures are enacted. Responsible Party: Facility Supervisor

An unhandled error has occurred. Reload 🗙