Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
C

Deficiency in Fire Protection System Policy

Brooklyn, New York Survey Completed on 12-19-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to prepare and maintain a policy for actions to be taken if the sprinkler system is out of service, leading to a deficiency. On December 16, 2024, a surveyor found a sprinkler head in a closet on the first floor, which was under construction, fitted with a protective cover. This cover rendered the sprinkler head inoperable in the event of an emergency. It was unclear how long the sprinkler head had been covered, and there was no record of a fire watch being conducted in this area while the sprinkler head was impaired. Further review on December 17, 2024, revealed that the facility's sprinkler documents and emergency preparedness policy lacked a policy for the protection of occupants if the automatic sprinkler system was out of service for more than 10 hours. During the exit conference, the facility's Administrator acknowledged the absence of such a policy and stated that they would develop one. This lack of policy and oversight in ensuring the operability of the fire protection system led to the cited deficiency.

Plan Of Correction

Plan of Correction: Approved January 13, 2025 Element 1 Corrective Action: The protective cover was removed immediately upon identification to restore full operability of the sprinkler head. A facility-wide inspection was conducted to ensure no other sprinkler heads were obstructed or otherwise impaired. All sprinkler heads were confirmed to be in proper working condition. A policy was developed and implemented to address the following: Procedures for protecting occupants when the sprinkler system or a portion of it is out of service for more than 10 hours, including interim life safety measures. Routine inspection of sprinkler systems during construction or maintenance projects. Prohibition of any action that impairs the functionality of sprinkler systems without proper documentation, risk assessment, and notification. Element 2 Residents at Risk: While no residents were affected by this practice, the potential existed for residents to be affected by this deficient practice. Element 3 Systemic Changes: All maintenance personnel will be educated on the new policy and requirements to maintain the sprinkler system. Training will include: Recognizing and reporting conditions that impair sprinkler system operations. Steps to implement life safety measures when sprinklers are out of service. An audit tool was developed to monitor compliance. Element 4 Monitoring of Corrective Action: The maintenance director will audit all sprinkler heads monthly to ensure no sprinkler heads are obstructed. The maintenance director will report all findings to the administrator on a monthly basis. The maintenance director will submit results of the audit to the QAPI Committee on a quarterly basis. The QAPI Committee will determine if further action is required. Element 5 Person Responsible: Maintenance Director