NY State Tag
E

Sprinkler System Maintenance Deficiency

Crown Heights Center For Nursing And RehabilitatioBrooklyn, New York Survey Completed on 12-19-2024

Summary

The facility failed to inspect, test, and maintain all components of the sprinkler system in accordance with the 2011 NFPA 25 standards. During a life safety survey conducted on December 16 and 17, 2024, it was observed that sprinkler heads were missing escutcheons in several areas, including the 1st floor IT room, the secondary ATS room next to the IT room, the 1st floor oxygen storage room, and the exit passageway leading from the 1st floor landing of stair C. Additionally, there was no record of the required 5-year internal pipe inspection in the maintenance, testing, and inspection records. These deficiencies were acknowledged by the Director of Maintenance at the time of the survey.

Plan Of Correction

Plan of Correction: Approved January 13, 2025 Element 1 Corrective Action: 1) The facility installed escutcheon plates on the identified sprinklers on the 1st floor next to the IT room, the secondary ATS room on the 1st floor next to the IT room, the 1st floor oxygen storage room, and the exit passageway leading from the 1st floor landing of stair C. 2) The facility engaged our licensed sprinkler inspection and testing vendor to complete the 5 year internal pipe inspection; testing was completed on (MONTH) 8, 2025. Element 2: While no residents were affected by this practice, the potential exists for residents to be affected by this practice. Element 3 Systemic Changes: All maintenance personnel will be educated on the new policy requirements to maintain the sprinkler system. Training will include: Inspection and testing requirements for the Automatic Sprinkler system in accordance with 2012 NFPA 25, and the maintenance of all components of the sprinkler system. An audit tool was developed to monitor compliance. Element 4: Monitoring of Corrective Action: The maintenance director will audit all sprinkler heads monthly to ensure no sprinkler heads are obstructed. The maintenance director will report all findings to the administrator on a monthly basis. The maintenance director will submit results of the audit to the QAPI Committee on a quarterly basis for 3 quarters/6 months. The QAPI Committee will determine if further action is required. Element 5: Person Responsible: Maintenance director

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other StateA5595C26E97201E0 citations

No citations found matching the criteria.

Citation search

Search every citation & Plan of Correction

Go to search
Citation watch

Track new serious citations across New York

Get a heads-up on the newest immediate-jeopardy (J–L) citations in New York — where surveyors are focused right now.

Free · about one email a month

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release July 29, 2026) and official state health department websites — never guesswork.

In your survey window? See what surveyors are citing.

The Survey-Prep Report maps your facility's risk from 12 months of CMS and state citation data — what's being cited around you and what to check first. $129 one-time.

Get the Survey-Prep Report
An unhandled error has occurred. Reload 🗙