Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0281
F

Failure to Provide Continuous Egress Illumination

New Brunswick, New Jersey Survey Completed on 12-12-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to provide proper illumination for the means of egress, as required by NFPA 101: 2012 Edition, Sections 19.2.8 and 7.8. This deficiency was identified during observations and interviews conducted on December 3, 2024. Specifically, the Kitchen corridor, which is over 27 feet long leading to the exit door, lacked lighting when the switch was in the OFF position. Similarly, the East Hall and West Hall were observed to have no lighting when their respective switches were in the OFF position. These observations were confirmed by the staff present during the survey. The deficiency had the potential to affect all 83 residents in the facility. The facility's representatives were informed of this issue during the Life Safety Code survey exit conference on December 5, 2024.

Plan Of Correction

Rose Mountain Care Center Facility ID: 3145384 Survey completion date: 12-12-2024 K281 - (F) Illumination of means of Egress Element One: The lights in the kitchen corridor were immediately repaired to have continued lighting while the switch is in the OFF position. The lights in the East wing hall were immediately repaired to have continued lighting while the switch is in the OFF position. The lights in the West wing hall were immediately repaired to have continued lighting while the switch is in the OFF position. Element Two: This deficient practice had the potential to affect all residents. Element Three: The U.S. FOIA (b) (6) was educated on the requirements for continuous lighting even while the light switch is in the OFF position. Element Four: The Maintenance director / designee will audit the West wing, East wing, and the Kitchen corridors to ensure there is continuous lighting even while the light switch is in the OFF position monthly x3. Results will be reported to the QAPI team for review.

An unhandled error has occurred. Reload 🗙