Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0761
D

Failure to Maintain Cross Corridor Fire Doors

Deland, Florida Survey Completed on 02-26-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain cross corridor fire doors in accordance with NFPA 80 (2010). During a facility tour with the Maintenance Director, it was observed that the cross corridor fire doors in the 500 Mall did not latch at floor level because the floor latching device, also known as the keeper, was not installed. This deficiency was confirmed during an interview with the Maintenance Director, who acknowledged the absence of the floor latching device and mentioned that corporate staff had advised it was not needed. These findings were verified by both the Maintenance Director and the Administrator during the exit conference.

Plan Of Correction

1. On 3/24/25, a floor latching device was ordered and will be installed upon delivery. The device is anticipated to be delivered and installed by 4/7/25. 2. On 3/25/25, the Maintenance Director observed other facility cross corridor doors to verify that latching devices are in place and functional, and all were found to be in good repair. Current facility residents have the potential to be affected by this deficient practice. Follow up based on findings. 3. On 3/24/25, the Facility Administrator/designee provided education for maintenance employees regarding NFPA 80 cross corridor fire door maintenance and required latching devices. 4. Maintenance Director/designee to monitor cross corridor fire doors to ensure latching devices are in place and functional monthly for 3 months. Findings to be reviewed during the monthly QAPI Committee Meeting. Modifications implemented if indicated.

An unhandled error has occurred. Reload 🗙