Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0211
E

Exit Door Accessibility Issue

Lehighton, Pennsylvania Survey Completed on 12-18-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that exit access was always maintained as readily accessible, affecting both floors of the building. During an observation on December 18, 2024, at 10:50 a.m., it was noted that the exit door to the outside from the 1st floor North Stair Tower required excessive force to open and remained difficult to open even after the initial attempt. This issue was confirmed during an exit interview with the Facility Administrator and Facilities Manager on the same day at 11:30 a.m.

Plan Of Correction

Door was repaired to close and open properly to comply with the Life Safety Code. Provided education to staff on the importance of maintaining a safe means of egress and exit. Also, the importance of preventative maintenance on the exterior doors. Monthly audits x 3 months of all exterior doors will be conducted to ensure the ongoing compliance. Any noncompliant items found will be corrected and reported/discussed with facility designee for correction. Findings to be reported to QAPI.

An unhandled error has occurred. Reload 🗙