Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0920
E

Electrical Equipment Deficiencies in Facility

Beaver, Pennsylvania Survey Completed on 02-04-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain electrical equipment in compliance with NFPA 99 2012 Edition, Chapter 10.1.1, as evidenced by observations made on February 3, 2025. Three instances of electrical equipment deficiencies were identified, affecting three out of 26 smoke compartments. Specifically, the electrical panel in the mechanical room of the main laundry was missing a cover, as well as the elevator control panels in both the west elevator pit room and the elevator penthouse. These deficiencies were confirmed during an interview with the Facility Administrator and the Director of Maintenance on February 4, 2025.

Plan Of Correction

1. The electrical panel in the mechanical room in the main laundry room was corrected. The elevator panel in the elevator pit room was corrected. The elevator panel in the elevator penthouse of the main building was corrected. 2. An ongoing audit is conducted and reviewed by the Director of Maintenance or Designee to assess electrical and control panels to ensure they are covered.

An unhandled error has occurred. Reload 🗙