Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0345
F

Fire Alarm System Maintenance Deficiency

Philadelphia, Pennsylvania Survey Completed on 01-23-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its fire alarm system, which affected the entire facility. During a document review on January 23, 2025, it was discovered that the fire alarm inspection report from July 29, 2024, indicated the system had four failed batteries. The facility was unable to provide documentation that these batteries had been replaced. Additionally, an observation on the same day revealed that a fire alarm strobe on the first floor in the Chapel Lobby was obstructed by a grandfather clock. These findings were confirmed during an exit interview with the Administrator and Maintenance Director.

Plan Of Correction

1. Failed batteries from the report dated 7-29-2024 have been ordered and replaced. The clock in the chapel lobby is moved so the fire alarm strobe is not blocked. 2. NHA/Designee will educate the maintenance director in follow up regarding the requirement for failed reports and to assure furniture does not block the fire alarm strobe. 3. NHA/Designee will audit the fire alarm reports monthly x 3 to ensure all components are functioning. 4. NHA/Designee will audit fire alarm strobes weekly x 4, monthly x 2 to ensure they are not blocked. 5. Results of audits to be reported at monthly QA.

An unhandled error has occurred. Reload 🗙