Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0363
E

Corridor Door Latching Deficiency

Quakertown, Pennsylvania Survey Completed on 02-10-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility was found to have a deficiency related to the maintenance of corridor doors, specifically in one of its five smoke compartments. During an observation conducted on February 10, 2025, at 11:45 a.m., it was noted that the door to the Ice Machine Room failed to latch properly. This failure to latch compromises the door's ability to resist the passage of smoke, which is a requirement for corridor doors in such facilities. The deficiency was confirmed during an exit conference with the Administrator and Maintenance Director on the same day at 1:15 p.m. The inability of the door to latch was acknowledged by the facility's representatives, indicating a lapse in maintaining the required safety standards for corridor doors. This issue affects the facility's compliance with regulations designed to ensure the safety and protection of residents and staff from smoke in the event of a fire.

Plan Of Correction

1) Parts were ordered for the door latch in the Ice Machine Room. 2) Maintenance will replace the latch when the part is received. 3) The maintenance director or designee will perform random weekly audits for 8 weeks, then monthly for two months, as part of a preventive maintenance plan to ensure corridor doors do not have problems closing. Results of the audit will be presented at the monthly QAPI meetings for review and or recommendations.