Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
E

Smoke Barrier Deficiencies on Two Floors

Kittanning, Pennsylvania Survey Completed on 12-18-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain smoke barrier requirements on two of five floors, as observed during a survey conducted on December 18, 2024. Numerous rooms, including storage, mechanical, electrical, oxygen storage, and corridors, were found to have deficiencies in their smoke barriers. Specifically, ceiling tiles were missing, broken, misaligned, sagging, deteriorated, and not fitting into the grid system. Additionally, the grid system itself was missing grid work, was in disrepair in several areas, and was not supporting the ceiling tiles. These conditions would allow the transfer of smoke, compromising the smoke barrier's effectiveness. The maintenance director confirmed these deficiencies during an interview on the same day.

Plan Of Correction

1. The smoke barriers, ceiling tiles, grid system, will be repaired on or before 1/14/2025. 2. Education will be provided to the maintenance department by Administrator or designee on the importance of maintaining smoke barrier standards. 3. Maintenance Director or designee will audit weekly x 4 weeks and monthly x 1 month. 4. Results will be discussed with QA committee with monitoring if applicable.

An unhandled error has occurred. Reload 🗙