Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0345
C

Fire Control Panel Maintenance Deficiency

Kittanning, Pennsylvania Survey Completed on 02-05-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the fire control panel, as evidenced by two separate observations. On December 18, 2024, the main fire control panel displayed an incorrect date and time, which was confirmed by the maintenance director. This indicates a failure in maintaining the accuracy of the fire alarm system's timekeeping function. During a subsequent Onsite Revisit Survey on February 5, 2025, the fire alarm panel indicated a trouble signal due to internal damage caused by a broken water line above the panel. The facility had implemented a fire watch and contacted a vendor for repairs, but at the time of the survey, there was no timeline for the completion of these repairs. The administrator and maintenance supervisor confirmed that the deficiencies were not resolved at the time of the revisit.

Plan Of Correction

1. The process for repairing the fire alarm has been started and is in the final steps for approval with additional parts being ordered after that. 2. Once the fire panel is repaired, the Maintenance Director or designee will monitor for appropriate operation and continue monthly fire drills as required. 3. Results will be reviewed with the QA committee with monitoring if applicable.

An unhandled error has occurred. Reload 🗙