Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Incomplete Sprinkler Head Assemblies Not Corrected

Topton, Pennsylvania Survey Completed on 12-09-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the hardware components of its automatic sprinkler protection system, affecting two of the four floors within the component. During an observation on October 7, 2024, it was noted that several sprinkler heads were missing an escutcheon in various locations, including the 3rd floor Pantry, the 1st floor RNAC Office within Nursing Administration by electrical panels, Resident Room 104, and two areas within the 1st floor Memory Care Unit. An interview with the Maintenance Lead confirmed that the sprinkler head assemblies were incomplete. A follow-up observation and interview on December 6, 2024, revealed that the issue had not been corrected, as confirmed by the Manager of Plant Operations.

Plan Of Correction

1. Escutcheons were installed on 12/12/24. 2. All sprinkler heads were checked to ensure escutcheons were in place 12/12/24. 3. Checks will be made by maintenance monthly to ensure that sprinkler escutcheons are in place. 4. Results of these checks will be made by the maintenance director to the monthly meeting of the Safety Committee and QAPI Committee.