Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Sprinkler System Maintenance Deficiencies

Laporte, Pennsylvania Survey Completed on 01-29-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its required sprinkler systems, as evidenced by observations and interviews conducted during a survey. The deficiencies were identified in five locations across three of the four floors of the facility. Specifically, on the 3rd floor, the Oxygen Storage room and a corridor near the Nurses' station were missing escutcheons. On the 1st floor, the Dietary area had an unsealed penetration of a ceiling tile near the dishwasher. In the Basement Level, the Maintenance Shop was missing an escutcheon, and the Tank Room's sprinkler box lacked a wrench for sprinkler head replacement. These deficiencies were confirmed during an exit conference with the facility administrator.

Plan Of Correction

Escutcheons were installed in the 3rd floor oxygen room, 3rd floor corridor, and maintenance shop on 2/3/2025. Ceiling tile in dietary was replaced on 1/30/2025. A sprinkler wrench was purchased and placed in the sprinkler box on 1/31/2025. The Maintenance Director audited facility sprinklers to verify escutcheons in place and ceiling tiles in the dietary department. The Maintenance Director was educated on maintaining the facility's sprinkler system by NHA. The Maintenance Director/designee will audit sprinklers to verify escutcheons are in place, the sprinkler box to verify the wrench is in place, and the dietary ceiling tiles weekly for 4 weeks and monthly for 3 months, and report findings to the monthly QAPI committee.