Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0363
E

Deficiency in Corridor Door Smoke Resistance

Philadelphia, Pennsylvania Survey Completed on 01-21-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to ensure that doors protecting corridor openings could resist the passage of smoke, which is a requirement for safety in long-term care facilities. This deficiency was observed on the third floor, specifically at the double doors near resident room 310. The doors were found to have a metal door frame with open penetrations above the closer, which compromises their ability to prevent smoke from passing through. During an exit interview with the Executive Director of Construction and Ancillary Services, it was confirmed that the metal door frame had penetrations. This issue affects one of the twenty-four floors in the facility, indicating a lapse in maintaining the required safety standards for corridor doors, particularly in smoke compartments.

Plan Of Correction

ED of construction to Inservice supervisor of plants operations on policy and procedure regarding corridor doors. Door closures will be installed in the same open mounting holes at top of frame to ensure smoke doesn't pass. Supervisor of Plant Operations to conduct audits 3x per week x 4 weeks to ensure all corridor doors are smoke tight in accordance with policies and procedures. Supervisor of Plant Operations or delegate to complete audits 3x per week x 4 weeks to compliance with policy and procedure. Audit findings will be submitted to QAPI committee monthly for review and recommendations as needed.

An unhandled error has occurred. Reload 🗙