Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Maintain Generator and Document Testing

Wyndmoor, Pennsylvania Survey Completed on 01-27-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its generator, which is essential for the entire facility's electrical system. During a document review on January 27, 2025, it was found that the facility did not provide documentation for several critical tests and inspections. These included weekly battery voltage or electrolyte levels testing, monthly specific gravity or conductance testing, monthly 30-minute under-load testing, monthly operation of transfer switches, and weekly visual inspections. Notably, the deficiencies in weekly battery voltage or electrolyte levels testing and monthly specific gravity or conductance testing were repeat deficiencies from the previous annual survey conducted on March 13, 2024. An interview with the Administrator and Maintenance Director on the same day confirmed that these tests had not been completed, and no documentation was logged for the past 12 months. This lack of documentation and testing indicates a failure to comply with the maintenance and testing requirements outlined in NFPA 101 and related standards, which are crucial for ensuring the reliability of the facility's essential electrical systems.

Plan Of Correction

1. All required tests and inspections were immediately scheduled. 2. A log was created to ensure proper documentation of all tests and inspections. 3. Education will be provided to ensure proper compliance with this regulation. 4. An audit of tests and inspections will be conducted to ensure proper documentation and compliance. Audit will be done 2x a month for 2 months and 1x a month for 1 month. 5. The findings of these quality monitoring's to be reported to the Quality Assurance/Performance Improvement Committee monthly x6 months.