Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Failure to Perform Required Sprinkler System Maintenance

Gettysburg, Pennsylvania Survey Completed on 02-04-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to perform required annual and tri-annual maintenance and testing on its sprinkler systems, as mandated by NFPA 25. During a document review on February 4, 2025, it was discovered that the facility did not have documentation for the annual inspection of the wet system, including the main drain and control valves, nor for the dry system's annual trip test and the 3-year full flow trip test. This deficiency was confirmed during an exit conference with the Administrator and Maintenance Director, who acknowledged that the inspections were not performed.

Plan Of Correction

The facility will have a sprinkler inspection completed on 3/4/25. The maintenance staff will be educated on completing a sprinkler inspection annually. A quarterly audit will be completed to ensure a sprinkler inspection was completed. Audit results will be reported to the next QAPI meeting.