Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0921

Failure to Perform Emergency Lighting Tests at Generator

Pottstown, Pennsylvania Survey Completed on 12-09-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to perform the required functional tests of the battery-powered emergency lighting source at the generator, which serves the entire component. During an observation on October 8, 2024, it was noted that the facility did not conduct the battery back-up emergency lighting test at the generator for 30 seconds monthly and 90 minutes annually. Additionally, the emergency light was found not mounted and was instead laying on an electrical duct. This deficiency was confirmed through an interview with the Director of Maintenance on the same day. A follow-up observation on December 9, 2024, revealed that the issue had not been corrected. The emergency lighting test had still not been performed, and the light fixture remained unmounted. The Director of Maintenance confirmed during interviews on December 9, 2024, that the deficiency identified in the initial observation had not been addressed.

Plan Of Correction

1. The facility is unable to retroactively conduct a 30-second monthly test or 90-minute annual test of the battery backup emergency lighting in the generator room before the survey. 2. The facility had a new Maintenance Director that started on 12/09/24. Maintenance or Designee will conduct a 30-second monthly test and a 90-minute annual test of the battery backup emergency lighting. The 90-minute test will be completed by 01/27/2025. Battery will be replaced as necessary. 3. Education will be provided to Maintenance staff regarding testing of the battery backup emergency lighting. Documentation of testing will be maintained in the Life Safety Book per regulation. 4. Maintenance Director or Designee will complete audits of routine testing monthly until substantial compliance has been achieved and quarterly thereafter. 5. Results of the audits will be presented to the QAPI committee for review and analysis for continued monitoring.

An unhandled error has occurred. Reload 🗙