Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Sprinkler System Deficiencies Unaddressed

Pottstown, Pennsylvania Survey Completed on 12-09-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to address deficiencies in its sprinkler system as identified by Johnson Control on February 29, 2024. These deficiencies included the need for replacement or recalibration of gauges, internal valve and pipe inspections, obstruction inspection, and replacement of a pipe with a pinhole over the kitchen. Additionally, the facility lacked a required fire department connection sign. These issues were confirmed through interviews with the Director of Maintenance on October 8, 2024, and again on December 9, 2024, when it was observed that the deficiencies had not been corrected.

Plan Of Correction

1. Johnson Control will be contacted to come out before 01/06/25: a. Replace or recalibrate gauges as needed b. Internal valve inspection c. Internal pipe inspection d. Obstruction inspection 2. Maintenance Director and Maintenance Staff will be educated on inspection and documentation requirements. Deficiencies identified by Johnson Control will be repaired. 3. An audit of the life safety book will be conducted quarterly for 12 months and bi-annually thereafter. 4. A fire department sign will be installed at the site of the connection. 5. Maintenance Director or Designee will conduct audits quarterly for 12 months, then biannually thereafter and filed in the LifeSafety. 6. Results of audits will be reported to the QAPI Committee for recommendations for review and analysis for ongoing monitoring.

An unhandled error has occurred. Reload 🗙