Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
F

Sprinkler System Maintenance Deficiency

Fort Washington, Pennsylvania Survey Completed on 12-23-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its sprinkler systems, which affected the entire facility. During a document review and interview conducted on December 23, 2024, it was found that the Annual Sprinkler Report dated October 24, 2024, identified a deficiency. Specifically, a hydrostatic test revealed a leak in the fire department connection piping. The necessary parts for repair were on order, but the repairs had not yet been completed. This deficiency was confirmed during an exit interview with the Administrator and Maintenance Director.

Plan Of Correction

NFPA 101 Sprinkler System - Maintenance and Testing Preparation and submission of this POC is required by state and federal law. This POC does not constitute an admission for purposes of general liability, professional malpractice or any other court proceeding. 1. Anticipated completion date for repair of sprinkler connection piping is 02/10/2025. A Limited Time Waiver will be submitted if repairs extend past completion date of 02/10/2025. 2. To identify other residents, facility reviewed last 3 months of sprinkler system reports. 3. To prevent this from reoccurring, NHA/designee reeducated maintenance staff on sprinkler system deficiencies. 4. Ongoing monitoring for compliance, Maintenance Director/designee will audit sprinkler system inspections for deficiencies weekly for 1 month then once monthly for two months. Results will be presented to QAPI committee for review and revision as needed.