Sprinkler System Installation Deficiency
Penalty
Summary
The facility failed to maintain automatic sprinkler system installation requirements in eight instances across more than 100 sprinklered compartments inspected throughout the building. During an observation on December 3, 2024, between 11:35 a.m. and 11:55 a.m., it was noted that standard response sprinkler heads were mixed with quick response sprinkler heads in several rooms on the second floor, specifically in rooms 236, 237, 238, 239, 240, 223, 233, and 234. This deficiency was confirmed during an interview with the Facility Administrator and Maintenance Director on the same day at 12:30 p.m., who acknowledged the presence of mixed response sprinkler heads.
Plan Of Correction
Unable to correct past deficient practice. The Administrator will educate the Maintenance Director on requirements of K0351. The Maintenance Director will secure vendors to complete a walkthrough of the center to identify all mixed head sprinklers for replacement. The Maintenance Director will secure bids for repairs, choose a best vendor and have repairs completed.