Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0223
E

Failure to Maintain Self-Closing Doors

Hatboro, Pennsylvania Survey Completed on 12-18-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain doors with self-closing devices on both levels of the building, as observed during a survey conducted on December 18, 2024. Several doors intended to be self-closing were found propped open or not functioning correctly. Specifically, the staff lounge ice room door was propped open with a door wedge, the A Wing lining closet door did not latch, and the B wing break room door was held open with a trash bag tied from the door handle to a handrail. Additionally, the chapel door was propped open with a chair, the sprinkler/janitor room door had a large gap between the door and frame when latched, the basement storage door was propped open with an installed kick down door stop, and the C wing clean lining door was propped open with a door stop. These deficiencies were confirmed during an exit interview with the Facility Administrator, Administrator in training, and the Director of Maintenance.

Plan Of Correction

All doorways will be kept closed at all times. Maintenance will do daily audits each day times 30 days. Then they will do weekly checks times 60 days. All stops whether portable or installed have been removed. A new door latch has been installed on the door on A Wing. A door will be installed at the Sprinkler Room as we have been unable to fix the gap. This will be completed by 1/30/25.

An unhandled error has occurred. Reload 🗙