Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
E

Failure to Maintain Battery Back-Up Lighting for Generator Transfer Switch

New Bloomfield, Pennsylvania Survey Completed on 12-16-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain battery back-up lighting for the generator transfer switch in one of four smoke zones. During an observation on December 16, 2024, at 12:50 PM, it was noted that the battery back-up light did not illuminate when tested. This deficiency was confirmed through an interview with the Director of Maintenance at the same time, who acknowledged the failure of the battery back-up light. The report indicates that the facility did not meet the requirements for maintaining essential electrical systems as outlined by NFPA standards. The deficiency was specifically related to the battery back-up lighting, which is crucial for ensuring the functionality of the generator transfer switch during power outages. The lack of proper maintenance and testing of this component led to the failure observed during the survey.

Plan Of Correction

1. Battery backup lighting was repaired. 2. The Maintenance Supervisor will receive re-education from the Administrator on maintaining the battery back up lighting for the generator transfer switch. 3. The facility will conduct an audit monthly of the battery back up lighting. 4. Audits will be reviewed in the next QAPI meeting. 5. The facility will be in substantial compliance by 2/14/2025.

An unhandled error has occurred. Reload 🗙