York Nursing And Rehabilitation CenterPhiladelphia, Pennsylvania Survey Completed on 01-30-2025

Summary

The facility failed to maintain building construction requirements as evidenced by the classification of the Center Building as a three-story, Type V (000), unprotected wood frame construction, which is fully sprinklered. This classification exceeded the maximum allowable story height for an unprotected wood frame construction by two stories. The issue was confirmed during an exit interview with the Administrator and the Maintenance Director, who acknowledged the building's non-compliance with the construction type and height regulations. Similarly, the South Building was classified as a three-story, Type II (000), unprotected non-combustible construction, which is also fully sprinklered. This classification exceeded the maximum allowable story height for an unprotected non-combustible construction by one story. The Assistant Administrator and Maintenance Director confirmed this non-compliance during an exit interview. Both instances indicate a failure to adhere to the NFPA 101 building construction type and height requirements, affecting the entire building components.

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
See other K0161 citations
Non-Compliance with Fire Resistance Rating Due to Excessive Building Height
C
K0161
Short Summary

Surveyors found that the facility, classified as a five-story Type II (000) unprotected non-combustible building with a basement, exceeded the maximum allowable number of stories for its construction type, despite being fully sprinklered. This non-compliance with NFPA 101 fire resistance requirements was confirmed by facility leadership and affects the entire building.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Follow Up on Building Structural Assessment
F
K0161
Short Summary

The facility did not follow up on a vendor-provided building structural assessment quote that was part of an ongoing plan of correction, as confirmed by document review and interview with the maintenance supervisor. This failure potentially affected the building's structural integrity.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Failure to Maintain Fire Resistive Rating Due to Missing Ceiling Tiles
E
K0161
Short Summary

Surveyors found that the facility did not maintain the required fire resistive rating on one floor, as missing rated ceiling tiles were observed in the second floor IT/Conference Room and confirmed by the Administrator and Maintenance Director.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Noncompliance with Building Construction Type and Height Requirements
C
K0161
Short Summary

Surveyors found that the facility is a four-story, Type II (000) unprotected noncombustible structure that is fully sprinklered, which exceeds the maximum number of stories allowed by the 2012 Life Safety Code for this construction type. Facility leadership confirmed the building's structure does not meet code requirements.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Noncompliance with Building Construction Type and Height Requirements
C
K0161
Short Summary

A survey found that the facility is a three-story, Type II (000) unprotected noncombustible building with a basement, which exceeds the maximum allowable story height for this construction type. The Director of Maintenance confirmed that the building's construction type and height are not permitted under current regulations.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.
Unsealed Ceiling Penetration in Electrical Room
D
K0161
Short Summary

During a facility inspection, an unsealed four-inch penetration was found in the ceiling of the electrical room, with a conduit passing through. The Maintenance Consultant stated that this resulted from recent utility upgrades where the vendor did not seal the opening after completing their work. The deficiency affected one of two smoke compartments.

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Know what gets cited — and walk into your next survey with full visibility

We process and analyze inspection reports and Plans of Correction using AI to surface insights and trends — so you can improve care quality and stay ahead of compliance risk before your next survey.

Get ready for your next survey

See what surveyors are citing in your state and spot your risk areas before they do.

Monthly Citation Reports

Have you been cited for this tag?

Save hours drafting a compliant Plan of Correction — AI built on real approved POCs.

Plan of Correction Writer

Trusted data from CMS and state health departments

Every citation, penalty and Plan of Correction is sourced from public CMS records (latest release May 27, 2026) and official state health department websites — never guesswork.

Trusted by long-term care providers and associations.

Allegria Senior Living logo
FHCA logo
WeCare Centers logo
Care Rehab logo
An unhandled error has occurred. Reload 🗙