Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
E0039
C

Failure to Conduct Required Emergency Plan Exercise

Philadelphia, Pennsylvania Survey Completed on 01-30-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to conduct the required annual full-scale exercise or an accepted substitution for testing its emergency plan. This deficiency was identified during a document review conducted on January 30, 2025, at 8:30 a.m. The review revealed that the facility did not perform a full-scale exercise within the previous 12 months, which is a requirement under the emergency preparedness regulations. The absence of documentation confirming the completion of the annual full-scale exercise was confirmed during an exit interview with the Administrator and the Maintenance Director on the same day at 11:30 a.m. This lack of documentation indicates that the facility did not meet the regulatory requirements for emergency preparedness testing. The deficiency affects the entire facility, as the emergency plan's effectiveness could not be adequately tested and evaluated without the required exercise. The failure to conduct the exercise or provide an acceptable substitution means that the facility did not comply with the mandated emergency preparedness protocols.

Plan Of Correction

E0039 Step 1 A full-scale disaster drill was completed on 1/10/2025. Evidence and signed documents of the drill were added to the emergency preparedness binder. Step 2 NHA educated on the requirement to complete full-scale disaster drills annually and to maintain documentation of the drill in the emergency preparedness binder. Step 3 NHA/ Designee will review the emergency preparedness manual annually to ensure a full-scale disaster drill was completed within the last 12 months.

An unhandled error has occurred. Reload 🗙