Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0363
E

Failure to Maintain Positive Latching on Corridor Door

Hanover, Pennsylvania Survey Completed on 02-12-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain corridor doors to positively latch in one of the seven smoke compartments. During an observation on February 12, 2025, at 1:15 PM, it was noted that the corridor door to Resident Room 207 on the second floor did not positively latch when closed. This deficiency was identified through both observation and interview, indicating a failure to comply with the requirement for corridor doors to resist the passage of smoke and to have positive latching hardware.

Plan Of Correction

Facility has repaired the door so it does positively latch. Facility has conducted an audit to ensure corridor doors were within compliance of regulation. Maintenance director/designee will conduct monthly inspections to ensure they positively latch. Audits will be reviewed at QAPI to ensure compliance.

An unhandled error has occurred. Reload 🗙