Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0324
F

Deficiencies in Kitchen Suppression System Documentation and Awareness

Erie, Pennsylvania Survey Completed on 02-06-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain proper documentation and awareness of the kitchen suppression systems in two of its kitchens, leading to deficiencies in compliance with NFPA 101 standards. In the Melrose kitchen, there was a lack of documentation confirming that the semi-annual kitchen suppression testing and maintenance had been completed, with the last recorded test occurring over a year prior. This was confirmed during an interview with the maintenance supervisor, who acknowledged that the necessary documentation was not available on-site during the survey. Similarly, in the Elmwood kitchen, the facility also failed to provide documentation of the semi-annual kitchen suppression testing and maintenance, with the last test documented over a year ago. Additionally, the kitchen staff members were unaware of the location of the manual pull activation for the kitchen hood suppression system, indicating a lack of training or communication regarding emergency procedures. These deficiencies were confirmed through observation and interviews conducted with the maintenance supervisor during the survey.

Plan Of Correction

The maintenance director provided supporting documentation to the inspector on 02/10/2025. Documentation was added to the survey readiness binder. The life safety checklist will be reviewed in the quarterly QAPI meeting. All dietary staff were reeducated on the Ansul system on 02/06/2025. Ansul system education will be included in the new hire building orientation for dietary department employees. Verbal drills will be conducted by the dietary manager or designee weekly for 1 month.

An unhandled error has occurred. Reload 🗙