Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0912
F

Failure to Test Electrical Receptacles Annually

Kittanning, Pennsylvania Survey Completed on 01-22-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to perform an annual test and inspection on non-hospital grade electrical receptacles in resident sleeping rooms throughout the entire facility. This deficiency was identified during a document review and interview conducted on January 22, 2025. The review revealed that electrical receptacles in resident care rooms were not tested at intervals not exceeding 12 months, as required. The testing should have included a visual inspection of physical integrity, verification of correct polarity of the hot and neutral connections, and ensuring the retention force of the grounding blade was not less than 115g (4 oz). An interview with the maintenance supervisor confirmed the lack of documentation for these tests.

Plan Of Correction

Maintenance immediately tested electrical receptacles. Maintenance to monthly testing of electrical receptacles and maintain documentation according to compliance. NHA/Designee to educate maintenance staff by 21MAR2025 about annual receptacle testing and maintaining proper documentation. NHA/designee to audit monthly x3 for electrical receptacle testing and documentation. Negative findings will be addressed accordingly. Ad Hoc education as needed. The results of the audits will be forwarded to the facility Quality Assurance Performance Improvement (QAPI) committee for further review and recommendations.

An unhandled error has occurred. Reload 🗙