Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0372
D

Smoke Barrier Deficiencies Due to Ceiling Tile Issues

Kittanning, Pennsylvania Survey Completed on 01-22-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain smoke barriers in over thirty rooms, affecting the entire component. During an observation conducted on January 22, 2025, between 8:45 a.m. and 10:15 a.m., it was noted that multiple ceiling tiles on the main floor were not properly maintained. These tiles were found to be loose, misaligned, damaged, or missing in various locations. Additionally, five rooms in the basement area were impacted by a recently frozen and ruptured pipe, which caused water damage to numerous ceiling tiles. The damaged tiles were removed to address the water damage and to facilitate repairs to the piping. The absence of these ceiling tiles could potentially delay the activation of fire system components and allow smoke to pass through. The maintenance supervisor confirmed these deficiencies during an interview at the time of the survey.

Plan Of Correction

Maintenance replaced damaged and deficient ceiling tiles. Maintenance completed a whole house audit to identify deficient ceiling tiles. NHA/Designee to educate maintenance staff by 21MAR2025 on the importance of ceiling tiles to ensure proper function for smoke barrier. Maintenance/designee to complete audits weekly x 4 of ceiling tiles. Negative findings will be addressed accordingly. Ad Hoc education as needed. The results of the audits will be forwarded to the facility Quality Assurance Performance Improvement (QAPI) committee for further review and recommendations. Fire Drill conducted immediately following the safety survey. No negative findings identified.