Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0353
E

Sprinkler System Maintenance Deficiencies

Wellsboro, Pennsylvania Survey Completed on 12-30-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain the automatic sprinkler system in three specific locations, affecting both floors of the building. During an observation on December 30, 2024, it was noted that there was an unsealed penetration in a ceiling tile in the janitor's closet near Resident Room B-24 on the second floor. Additionally, the transportation garage on the first floor was missing an escutcheon in the ceiling, and the janitor's closet near the East Exit on the first floor was missing a ceiling tile. These deficiencies were confirmed during an exit interview with the Facility Administrator, Facility Assistant Administrator, and a Facility Representative.

Plan Of Correction

The Facility submits this Plan of Correction under procedures established by the Department of Health in order to comply with the Department's directive to change conditions which the Department alleges is deficient under State and/or Federal Long Term Care Regulations. This Plan of Correction should not be construed as either a waiver of the facility's right to appeal or challenge the accuracy or severity of the alleged deficiencies or an admission of past or ongoing violation of State or Federal regulatory requirements. a. The penetration in the ceiling tile in the second-floor janitor's closet, near resident room B-24 was repaired and the work was documented in work order #20321912. b. The escutcheon in the ceiling of the first-floor transportation garage will be replaced and the work will be documented in work order #20321923. c. The ceiling tile in the first-floor janitor's closet was replaced and the work was documented in work order #20321924. The Facilities Manager or his designee will maintain compliance through monthly safety rounding to identify and correct issues related to automatic sprinkler systems. All four of the corrective actions will be completed by February 4, 2025. The Facilities Manager is responsible to ensure that corrections are completed and documented in the maintenance work order program.