Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0321
E

Hazardous Area Enclosure Deficiency on Second Floor

Wellsboro, Pennsylvania Survey Completed on 12-30-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain a proper hazardous area enclosure on the second floor. During an observation on December 30, 2024, at 11:01 am, it was noted that the Mechanical Room had two unsealed penetrations in the concrete ceiling. This deficiency was confirmed during an exit interview with the Facility Administrator, Facility Assistant Administrator, and Facility Representative #1 on the same day at 12:30 pm.

Plan Of Correction

The Facility submits this Plan of Correction under procedures established by the Department of Health in order to comply with the Department's directive to change conditions which the Department alleges is deficient under State and/or Federal Long Term Care Regulations. This Plan of Correction should not be construed as either a waiver of the facility's right to appeal or challenge the accuracy or severity of the alleged deficiencies or an admission of past or ongoing violation of State or Federal regulatory requirements. 1. The penetrations in the concrete ceiling of the second-floor mechanical room were repaired and the work was documented in work order #20321914. The Facilities Manager or his designee will maintain compliance through monthly safety rounding to identify and correct issues related to hazardous area enclosures. 2. This corrective action was completed on the day of the survey. The Facilities Manager is responsible to ensure that corrections are completed and documented in the maintenance work order program.