Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0345
F

Fire Alarm System Maintenance Deficiency

Levittown, Pennsylvania Survey Completed on 12-03-2024

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to maintain its fire alarm system, as evidenced by the document review and interview conducted during the survey. The annual fire alarm inspection report from September 2024 identified several deficiencies that remained uncorrected by the time of the survey in December 2024. Specifically, the A-wing strobes were out of synchronization, requiring immediate investigation and correction. Additionally, the two 12V9AH batteries in the Main Fire Alarm Control Panel (FACP) failed and needed replacement as soon as possible. Furthermore, the system was overdue for sensitivity testing, which also required prompt attention. These deficiencies were confirmed during the exit interview with the Administrator and Maintenance Director.

Plan Of Correction

A wing strobes adjusted to be in synchronization, batteries in the main FACP replaced, and sensitivity testing completed. Maintenance Staff and vendor educated to timely repairs following inspections. Maintenance Director will schedule all repairs with vendor immediately following inspections so repairs will be made timely.

An unhandled error has occurred. Reload 🗙