Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0918
F

Failure to Perform Annual Emergency Generator Maintenance Testing

North Huntingdon, Pennsylvania Survey Completed on 01-28-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to perform the required emergency generator maintenance testing over the past 12 months. During a documentation review on January 28, 2025, it was discovered that the facility did not have records of an annual preventive maintenance (PM) test for the emergency generator. This lack of documentation indicates that the facility did not conduct the necessary testing to ensure the generator's functionality and compliance with NFPA standards. An interview with the Facility Administrator and Maintenance Director confirmed that the documentation for the annual generator testing was not available at the time of the survey. This deficiency highlights a lapse in the facility's adherence to the maintenance and testing protocols required for emergency power systems, as outlined by NFPA 101, NFPA 110, and NFPA 111 standards.

Plan Of Correction

The facility will perform emergency generator maintenance testing annually as required. The facility will schedule and complete annual emergency generator PM. Documentation of the PM will be stored and maintained by the facility. The administrator will audit emergency generator PM logs to ensure PM is being completed as required. Maintenance director will be educated on federal tag F0918.

An unhandled error has occurred. Reload 🗙