Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
K0222
F

Delayed Egress Lock Failure

Kearny, New Jersey Survey Completed on 12-05-2024

Penalty

Fine: $25,635
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

The facility failed to meet the delayed egress locking requirements as specified in the NFPA 101 Life Safety Code (2012 Edition). During an observation, it was noted that an exit door between rooms 101 and 118 did not sound an audible alarm after 15 seconds of pressure was applied, as required. The signage on the door indicated that the locks would unlock after 15 seconds and an alarm would sound, but this did not occur. This deficiency had the potential to affect staff and 12 residents. During an interview conducted at the time of the observation, a staff member confirmed the finding and stated that the facility was unaware that the delayed egress lock was not functioning properly.

Plan Of Correction

The delayed egress door for exit between rooms 101 and 118 was repaired to initiate an audible alarm after 15 seconds of pressure is applied to the door. All residents have the potential to be affected by this deficient practice. The Maintenance Director checked all delayed egress doors in the building to assure all had audible alarm after 15 seconds of pressure is applied to the door. All doors were found to be in working order. The Maintenance Director will make monthly rounds to ensure all delayed egress door initiates an audible alarm after 15 seconds of pressure is applied to the door. The Maintenance Director will report the results of these audits to the Administrator on a monthly basis. The Maintenance Director will review the findings of the monthly audits at the Quarterly QAPI Meeting for the next 2 quarters.

An unhandled error has occurred. Reload 🗙