Stay Ahead of Compliance with Monthly Citation Updates


In your State Survey window and need a snapshot of your risks?

Survey Preparedness Report

One Time Fee
$79
  • Last 12 months of citation data in one tailored report
  • Pinpoint the tags driving penalties in facilities like yours
  • Jump to regulations and pathways used by surveyors
  • Access to your report within 2 hours of purchase
  • Easily share it with your team - no registration needed
Get Your Report Now →

Monthly citation updates straight to your inbox for ongoing preparation?

Monthly Citation Reports

$18.90 per month
  • Latest citation updates delivered monthly to your email
  • Citations organized by compliance areas
  • Shared automatically with your team, by area
  • Customizable for your state(s) of interest
  • Direct links to CMS documentation relevant parts
Learn more →

Save Hours of Work with AI-Powered Plan of Correction Writer


One-Time Fee

$49 per Plan of Correction
Volume discounts available – save up to 20%
  • Quickly search for approved POC from other facilities
  • Instant access
  • Intuitive interface
  • No recurring fees
  • Save hours of work
NY State Tag
E

Deficiency in Equipment Maintenance and Inspection

Kenmore, New York Survey Completed on 01-08-2025

Penalty

No penalty information released
tooltip icon
The penalty, as released by CMS, applies to the entire inspection this citation is part of, covering all citations and f-tags issued, not just this specific f-tag. For the complete original report, please refer to the 'Details' section.

Summary

During a Life Safety Code survey, it was found that patient care-related electrical equipment was not inspected and tested according to the manufacturer's recommendations. Specifically, a Brand A suction machine located on a crash cart in Unit 1 East had stickers from an outside contractor indicating upcoming preventative maintenance, but there was no record of the device in the contractor's inventory or any inspection having been performed. The Director of Plant Operations confirmed that the outside contractor was responsible for maintaining the suction machines, and in-house staff did not perform maintenance. However, the contractor admitted that their employee might have placed the stickers on the device without conducting proper inspection procedures. Additionally, nursing staff reported they did not perform maintenance tasks such as checking or replacing internal components of the suction machine. Similarly, a Brand B portable Hoyer-type resident lift in the 1 West Unit was found to have overdue preventative maintenance. The lift had stickers from the same outside contractor, but the last recorded inspection was on 11/15/23, indicating that the required twelve-month maintenance was overdue. The Director of Plant Operations stated that the outside contractor was responsible for maintaining the lifts, and the Director of Long Term Care Facilities believed that the contractor's visits were automatic and did not require scheduling by facility staff. This lack of oversight and communication led to the deficiency in ensuring that the equipment was properly maintained and inspected as per regulatory requirements.

Plan Of Correction

Plan of Correction: Approved February 5, 2025 What corrective action will be accomplished: The suction machine on 1 East Unit and the Hoyer-type resident lift on 1 West unit have been removed from service and will not return to service until preventative maintenance is completed. All residents have the potential to be affected by the same deficient practice. Facility suction machines and Hoyer-type resident lifts will be audited by outside contractor beginning (MONTH) 3, 2025 to ensure that timely preventative maintenance has occurred. Measures to be put into place include audit of facility suction machines (monthly) and Hoyer-type resident lifts (weekly) to ensure preventative maintenance has occurred. Maintenance staff will be educated to ensure suction machine and portable resident lift are inspected, tested, and maintained per manufacturer's recommendations. Facility will maintain documentation for their inspections, testing, and maintenance. How the corrective action will be monitored: The audits will be reviewed by Administration and reported to the Quality Assurance Committee. Plant Operations Director will be responsible to ensure compliance.

An unhandled error has occurred. Reload 🗙